Type
Three level puzzle stacker
No. of Cars per Unit
Variable as per client requirements
Lifting Capacity
2000kg (Per Car Weight)
Lifting Time
35-45 seconds
Sliding Time
15-20 seconds per platform
Operation
Motor-Chain mechanism, integrated system with Touch Screen/ Keyboard operation
Power Supply
415V, 3Phase, 50Hz
Power Consumption
Upto 0.03 Units per stack Lifting and 0.01 units per sliding operation approx.
Requirements from Client:
- The area alloted for parking must be cleared with no obstructions.
- Duration erection of the system, client should provide storage facilities for keeping our tools and valuable parts of the system.
- Temporary Electrical connection must be provided at the time of erection and installation of the systems.
- MCB and main Electrical Connection (or 4 Pole RCBO) along with electrical cable fitting must be provided from the Main Power Supply to the Parking Systems with 3phase 415v AC, 50hz with Neutral and Earth (3phase + Neutral + Earth)
- Incoming Cable size should 5 core x 2.5sq. mm. Flexible Copper multi core Cable (3Phase + Neutral + Earth) from Main Switch to Control Panel
- Civil work as foundation for stack parking system must be done at stack parking alloted area prior to installation.
- Base area of the parking alloted shall be concrete with minimum strength of M20.
- In case of parking installed in open to Sky location, it is recommended to have a weather covering over the installation to prevent damage to the electronics/ mechanism due to weathering.